Why should the load be lowered to a safe position before stowing the crane after a lift?

To increase hoist speed

To test structural integrity of the mast

To change load color

To prevent movement or swinging during stowage

Lowering the load to a safe position before stowing the crane ensures the load is controlled and secured, so it cannot swing or shift when the crane is moved into the stowed position. This prevents dangerous movement that could strike personnel or nearby equipment, reduces dynamic forces on the hoist rope and crane structure, and helps the crane come to a stable resting state. If the load stays suspended, any movement of the crane or wind can cause it to swing, creating a hazardous situation during stowage. The other options don’t address movement control or safety during stowage.

Want more questions?

All options are one-time payments.

$25.99

30 day pass for new members

All the basics to get you started

  • Ad-free experience
  • View your previous attempt history
  • Mobile app access
  • In-depth explanations
  • 30 day premium pass access
$59.99$171.99 usd

6 month DELUXE pass (most popular)

Full access FOR 6 MONTHS! & the ultimate digital PDF study guide (BONUS)

  • $171.99 usd value for $59.99! You save $106!
  • Ad-free experience
  • View your previous attempt history
  • Mobile app access
  • In-depth explanations
  • 6 months of full access
  • Ultimate digital PDF study guide included
  • Priority support
$15.99 $24.99

Ultimate digital PDF study guide

For those that prefer a more traditional form of learning

  • Available for instant download
  • Available offline
  • Hundreds of practice multiple choice questions
  • Comprehensive content
  • Detailed explanations
Image Description
Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy